Bedlington railway station was a railway station that served the town of Bedlington, Northumberland, England from 1850 to 1964 on the Blyth and Tyne Railway. The station was closed by British Railways in 1964, but construction of a new station is now underway.

1. History

The station was opened on 3 August 1850 by the Blyth and Tyne Railway. The station was situated on the north side of the level crossing on Station Road, west of the junction with Palace Road. Nearby was Bedlington Colliery. In 1911, NER statistics showed that a population of 14,755 was served by the station in that year. In the inter-war years, residential development grew in the vicinity of the station, thus the number of users who used it grew. The station closed to both passengers and goods traffic on 2 November 1964.

1. Reopening proposals

Proposals to reintroduce passenger rail services to the currently freight-only section of the former Blyth and Tyne Railway system have been discussed since the 1990s. In the early 2010s, Northumberland County Council became interested in the proposals, commissioning Network Rail to complete a GRIP 1 study to examine the best options for the scheme in June 2013. This report was published in March 2014 and was followed in June 2015 with the commissioning of a more detailed GRIP 2 study at a cost of £850,000. The GRIP 2 study, published in October 2016, confirmed that the reintroduction of a frequent seven-day a week passenger service between Newcastle, Ashington and possibly a new terminus to the east, at Woodhorn, was feasible and could provide economic benefits of £70 million with more than 380,000 people using the line each year by 2034. Despite a change in the political leadership of Northumberland County Council following the 2017 local elections the authority continued to develop the project, encouraged by the Department for Transport's November 2017 report, A Strategic Vision for Rail, which named the line as a possible candidate for a future reintroduction of passenger services. Consequentially, NCC commissioned a further interim study in November 2017 (dubbed GRIP 2B) to determine whether high costs and long timescales identified in the GRIP 2 Study could be reduced by reducing the initial scope of the project, but the report failed to deliver on this.

Nonetheless, the county council has continued to develop the project, hiring AECOM and SCL Rail as contractors to develop the scheme on their behalf in 2018 and allocating an additional £3.46 million in funding for a further business case and detailed design study (equivalent to GRIP 3) in February 2019. Revised plans were revealed in July 2019 which were reduced in scope from the 2016 GRIP 2 study and proposed 4-phase project to reduce the initial cost of the scheme. Phase 1 (at an estimated cost of £90 million) would have seen Bedlington station reopened as the penultimate stop for hourly passenger trains on the Newcastle to Ashington Northumberland Line, while later phases would have added additional stations and the infrastructure upgrades required elsewhere on the line to provide a half-hourly frequency. However, in August 2020 it was reported that these four proposed phases might be merged into a single one. The North East Joint Transport Committee's bid for £377 million of funding from the UK Government's £1.28 billion Transforming Cities Fund, submitted on 20 June 2019, includes £99 million to fund the reintroduction of passenger services between Newcastle and Ashington, while further work is ongoing to secure additional public and private investment for the project. The Department for Transport allocated an initial grant of £1.5 million towards the project costs in January 2020 which was supplemented by an allocation of £10 million of funds from Northumberland County Council the following month. This funding enabled AECOM to begin detailed on-site ground investigation works in October 2020. The allocation of a further £34 million of UK Government funding for the project in January 2021 enables the necessary land to be purchased, detailed designs to be prepared and some early preparatory and site works to begin. In January 2021, it was anticipated that the UK Government would fund the remainder of the project cost, estimated at £166 million as of January 2021, once the final phase of design works were completed. However, in April 2021, it was reported that government officials were seeking to reduce the cost of the project as part of the Department for Transport's Project SPEED initiative. It was reported that the cost-saving measures under consideration included and cutting initial service frequencies from two to one trains per hour and dropping the proposed Blyth Bebside station from initial project scope (although the latter option was later publicly ruled out by Minister for Railways Chris Heaton-Harris). A planning application for the proposed new station at Bedlington was submitted to Northumberland County Council on 18 March 2021. The submitted planning documents indicate that the new station will be constructed on the same site as the previous one, with part of the extant original platform to be rebuilt for incorporation into a new 100 m (110 yd) down (northbound) platform and the surviving station buildings retained. An entirely new 100 m (110 yd) up (southbound) platform will be added on the opposite (west) side of the through lines, between Bedlington South Level Crossing and the junction with the line to Morpeth. Passengers will be able to transfer between the two platforms using the existing level crossing. The station will be served by two car parks: one with 36 spaces will be located immediately to the northeast of the up platform, while the other will have 31 spaces and will be located on the opposite (north) side of Barrington Road. Northumberland County Council submitted a Transport and Works Act Order application to the Secretary of State for Transport Grant Shapps on 26 May 2021, which was approved on 27 June 2022. The council has been conferred certain additional powers deemed necessary for the new stations to be constructed and the line upgraded to carry regular passenger services. The new Bedlington station will be constructed by the project's primary construction contractor, Morgan Sindall. The main construction phase began in autumn 2022, with a planned opening date in 2024. In January 2024, it was announced that the station had been delayed and would not open in 2024. It is now scheduled to open in early 2026.

1. References


1. = Sources =

Bevan, Alan, ed. (1998). A-Z of Rail Reopenings (fourth ed.). Fareham: Railway Development Society Ltd. p. 59. ISBN 0-901283-13-4. "Connecting Communities – Expanding Access to the Rail Network" (PDF). London: Association of Train Operating Companies. June 2009. Retrieved 7 September 2018. "21/01106/CCD - Planning Application Documents". Northumberland County Council. 17 March 2021. Retrieved 30 June 2021.

1. External links
Nearby Places View Menu
Location Image
479 m

Bedlington Academy

Bedlington Academy (formerly Bedlingtonshire Community High School) is a coeducational secondary school and sixth form in Bedlington in the English county of Northumberland.
Location Image
1.1 km

Blyth and Ashington

Blyth and Ashington is a constituency represented in the House of Commons of the UK Parliament since 2024 by Ian Lavery of the Labour Party. Created as a result of the 2023 Periodic Review of Westminster constituencies, it was first contested at the 2024 general election and is currently held by Ian Lavery of the Labour Party, who previously held the abolished constituency of Wansbeck from 2010 to 2024.
Location Image
1.3 km

Bedlington

Bedlington is a town in the civil parish of West Bedlington, in Northumberland, England, with a population of 18,470 measured at the 2011 Census. Bedlington is an ancient market town, with a rich history of industry and innovative residents. Located roughly 10 miles (16 kilometres) northeast of Newcastle and Newcastle Airport, Bedlington is roughly 10 minutes from the A1 road, in southeast Northumberland. Other nearby places include Morpeth to the northwest, Ashington to the northeast, Blyth to the east and Cramlington to the south. In 1961 the parish had a population of 29,403. The town has evidence of habitation from the Bronze Age, with a burial site being located just behind what is now the main Front Street. A cluster of Bronze Age cist burials were discovered during excavation of the site in the 1930s. St Cuthbert's Church is the longest standing building in the town, with parts of this dating back to the 11th century and recently celebrated being 1000 years old. The church is in the heart of the original sandstone conservation town centre. Most of the medieval town has disappeared with many of the historic buildings and factories being demolished over the years, but there are still nods to medieval street layouts. The main Front Street is currently made up of Georgian and Victorian buildings. At key points in history, before and during the Industrial Revolution, goods made in Bedlington made it to all corners of the globe through the distribution of nails and trains that were made in Bedlington from some 250 years ago. With large industry first being attracted to Bedlington over 250 years ago, in the form of its iron works, mining became an intrinsic part of Bedlington from 1838. The coal industry remained at the heart of the town until the closure of the mines in the 1980s. Today Bedlington's Front Street is host to a number of well-established eating and drinking venues, and there is an emergence of new establishments and retailers entering the town. The parish of Bedlington constituted the historic exclave of County Durham called Bedlingtonshire.
1.5 km

Bomarsund, Northumberland

Bomarsund is a village in Northumberland, in England. It is situated to the north of Bedlington, and just south of Stakeford. The village grew around a coal pit opened in 1854 and was named after the August 1854 battle – part of the Crimean War – at the fortress of Bomarsund in Sund, Åland, now part of Finland. The village was home to the former Northumberland Brewery. Bomarsund won the National Village Cricket Championship in 1974. They beat a team from Collingham, Nottinghamshire by three wickets in the final, which was played at Edgbaston, after the original match at Lord's was rained off.