Location Image

High Harrington railway station

High Harrington railway station was opened by the Cleator and Workington Junction Railway (C&WJR) in 1879. It was situated half a mile south of Harrington Junction on the company's main line. and served what was then the eastern extremity of Harrington in Cumbria, England. The station is not to be confused with the current Harrington station a kilometre away on the coastal line.

1. History

The line was one of the fruits of the rapid industrialisation of West Cumberland in the second half of the nineteenth century, specifically being born as a reaction to oligopolistic behaviour by the London and North Western and Whitehaven, Cleator and Egremont Railways. The station was on the line from Moor Row to Workington Central. Both line and station opened to passengers on 1 October 1879. All lines in the area were primarily aimed at mineral traffic, notably iron ore, coal and limestone, none more so than the new line to Workington, which earned the local name "The Track of the Ironmasters". General goods and passenger services were provided, but were very small beer compared with mineral traffic. The founding Act of Parliament of June 1878 confirmed the company's agreement with the Furness Railway that the latter would operate the line for one third of the receipts.

1. Services

Passenger trains consisted of antiquated Furness stock hauled largely by elderly Furness engines referred to as "rolling ruins" by one author after a footplate ride in 1949. No Sunday passenger service was ever provided on the line. The initial passenger service in 1879 consisted of

two Up (northbound) trains a day, leaving Moor Row at 09:20 and 13:45, calling at Cleator Moor, Moresby Parks, Distington, High Harrington and terminating at Workington, taking 30 minutes in all. they returned as Down trains, leaving Workington at 10:30 and 16:00 In 1880 the extension northwards to Siddick Junction was opened. The service was extended to run to and from Siddick and an extra train was added, with

three up trains a day, leaving Moor Row at 07:40, 10:12 and 14:45, taking 30 minutes to Workington and an extra four to proceed to Siddick, where connections were made with the MCR. Down trains left Siddick at 08:45, 12:22 and 17:00 By 1922 the service reached its high water mark, with:

five up trains a day from Moor Row through to Siddick, leaving Moor Row at 07:20, 09:50, 13:15, 16:50 and 1820. one train Mondays to Fridays Only from Moor Row to Workington, leaving at 13:45 and also calling at Moresby Junction Halt, making that halt qualify as a publicly advertised passenger station one Saturdays Only train leaving Cleator Moor (NB not from Moor Row) at 12:50 for Workington one Saturdays Only train leaving Moor Row at 19:35 for Workington There was one fewer Down train, as the 09:50 Up was provided to give a connection at Siddick with a fast MCR train to Carlisle with connections beyond. Two Saturdays Only trains left Oatlands at 16:05 and 21:35 for Workington, calling at Distington and High Harrington, with balancing workings leaving Workington at 15:30 and 21:00. There were also trains using the Lowca Light Railway plying between Lowca and Workington; they turned off the main line at Harrington Junction and therefore served no "pure" C&WJR stations other than Workington Central. As with advertised passenger trains, in 1920 workmen's trains ran on the company's three southern routes:

between Workington Central and Lowca using the Lowca Light Railway between Arlecdon (Rowrah's "other station") and Oatlands on the single track "Baird's Line", and on the "main line" between Siddick Junction and Moor Row from Siddick Junction to Moor Row, calling at all passenger stations except Moresby Parks, calling at Moresby Junction Halt instead from Moor Row to Moresby Junction Halt, calling at Cleator Moor and Keekle Colliers' Platform The situation in 1922 was similar. The 1920 Working Time Table shows relatively few Goods trains, with just one a day in each direction booked to call at High Harrington. Mineral traffic was an altogether different matter, dwarfing all other traffic in volume, receipts and profits. The key source summarises it "...the 'Track of the Ironmasters' ran like a main traffic artery through an area honeycombed with mines, quarries and ironworks." The associated drama was all the greater because all the company's lines abounded with steep inclines and sharp curves, frequently requiring banking. The saving grace was that south of Workington at least, most gradients favoured loaded trains. During the First World War especially, the company ran "Double Trains", akin to North American practice, with two mineral trains coupled together and a banking engine behind, i.e. locomotive-wagons-guards van-locomotive-wagons-guards van-banker. Such trains worked regularly between Distington and Cleator Moor West. The practice was discontinued after dark from 1 April 1918. Most stations on the company's lines had heavy industrial neighbours, such as ironworks next to Cleator Moor West, or served primarily industrial workforces, such as Keekle Colliers' Platform. Throughout its working life High Harrington was more isolated, with heavy industry visible but not next to the station. By 2013 the station site was flanked substantial housing estates. Like any business tied to one or few industries, the railway was at the mercy of trade fluctuations and technological change. The Cumberland iron industry led the charge in the nineteenth century, but became less and less competitive as time passed and local ore became worked out and harder to win, taking the fortunes of the railway with it. The peak year was 1909, when 1,644,514 tons of freight were handled. Ominously for the line, that tonnage was down to just over 800,000 by 1922, bringing receipts of £83,349, compared with passenger fares totalling £6,570.

1. Rundown and closure

The high water mark for tonnage was 1909, the high water mark for progress was 1913, with the opening of the Harrington and Lowca line for passenger traffic. A chronology of the line's affairs from 1876 to 1992 has almost no entries before 1914 which fail to include "opened" or "commenced". After 1918 the position was reversed, when the litany of step-by-step closures and withdrawals was relieved only by a control cabin and a signalbox being erected in 1919 and the Admiralty saving the northern extension in 1937 by establishing an armaments depot at Broughton. High Harrington station closed on 13 April 1931 when normal passenger traffic ended along the line. Diversions and specials, for example to football matches, made use of the line, but it was not easy to use as a through north–south route because all such trains would have to reverse at Moor Row or Corkickle. An enthusiasts' special ran through on 6 September 1954, the only one to do so using main line passenger stock. The next such train to traverse any C&WJR metals did so in 1966 at the north end of the line, three years after the line through High Harrington closed.

1. Afterlife

By 2013 aerial images clearly show the line of route and that the area around the station site had been transformed by housing. The trackbed through the station site was used by the West Cumbria Cycle Network.

1. See also

Maryport and Carlisle Railway Furness Railway Whitehaven, Cleator and Egremont Railway Cockermouth and Workington Railway

1. References


1. = Sources =


1. Further reading


1. External links

Map of the CWJR with photos RAILSCOT Map of the WC&ER with photos RAILSCOT The station Rail Map Online The station on overlain OS maps surveyed from 1898 Archived 30 November 2012 at the Wayback Machine National Library of Scotland The closed station on a 1948 OS Map npe maps The station and line railwaycodes The railways of Cumbria Cumbrian Railways Association Photos of Cumbrian railways Cumbrian Railways Association The railways of Cumbria Railways_of_Cumbria Cumbrian Industrial History Cumbria Industrial History Society Furness Railtour using many West Cumberland lines 5 September 1954 sixbellsjunction A video tour-de-force of the region's closed lines cumbriafilmarchive 1882 RCH Diagram showing the station, see page 173 of the pdf google Haematite earthminerals Coal and iron ore mining in Cleator Moor Haig Pit Photos of the station, line, staff, tickets and timetables Harrington History

Nearby Places View Menu
Location Image
422 m

Harrington Church Road Halt railway station

Harrington railway station, or Church Road halt, was a railway station in Harrington, Cumbria, England. It was opened by the Cleator and Workington Junction Railway (C&WJR) on the company's Harrington Branch which connected with the Lowca Light Railway at Rosehill to provide a through route from Lowca to Workington Central and beyond. Official, authoritative and regional sources variously refer to the halt as Harrington (Church Road Halt), Harrington Church Road, Church Road Halt and simply Church Road. Sources agree when the halt closed, but differ on when it opened. One authoritative source gives the opening as November 1913, whilst a key source with local knowledge gives both 1918 and November 1913 as the date the halt first appeared on the timetable. A later writer says the halt was in use by September 1913.
908 m

Salterbeck

Salterbeck is a housing estate on the south side of Workington, Cumbria, England, which was built during the 1930s on farmland for steelworkers and their families relocating to the area. Roughly 70% of the houses are now owned by Riverside Housing Association and the remainder are privately owned. Salterbeck is bordered by Westfield and Mossbay to the north and Harrington to the south.
Location Image
964 m

Harrington railway station

Harrington railway station is a railway station serving the village of Harrington in Cumbria, England. It is on the Cumbrian Coast Line, which runs between Carlisle and Barrow-in-Furness. It is owned by Network Rail and managed by Northern Trains.
Location Image
970 m

Harrington, Cumbria

Harrington is a suburban village on the southern outskirts of Workington, in the Cumberland district of Cumbria, England. It was formerly a separate village and parish; it has been administered as part of Workington since 1934, and is now classed as part of the Workington built up area. It lies on the coast and has a small harbour. Harrington railway station is on the Cumbrian Coast Line. In the late 18th century, the old village of Harrington, which stood a little way inland from the coast, was expanded into a planned town around a new harbour built to serve the local coal mines. Through the 19th century and into the 20th century, industries in Harrington included iron works, shipbuilding and chemical works. The major heavy industries had closed by the mid 20th century. Much of the 18th century planned town was demolished in slum clearance schemes in the 1960s, and the site is now public open space south of the harbour. Harrington today is in two main parts: the main part lies on the inland side of the coastal railway, and High Harrington is further inland to the east. The old parish of Harrington also included a rural area to the south, which became the separate parish of Lowca in 1934 when the rest of Harrington was absorbed into Workington. Harrington today gives its name to an electoral ward, which covers a different area to the old parish. The ward additionally includes Salterbeck and Winscales, which were historically part of Workington parish.