A1085 road
The A1085 is a road that runs from Middlesbrough to Marske-by-the-Sea in the former county of Cleveland. There is a long straight part of the road whilst it passes the former ICI Wilton plant towards Redcar, this part of the road is the main road towards Redcar from the west and towards Middlesbrough and the A66 from the east. It is 11.3 miles (18.2 km) long.
1. References
Nearby Places View Menu
535 m
Teesside Steelworks
The Teesside Steelworks was a large steelworks that formed a continuous stretch along the south bank of the River Tees from the towns of Middlesbrough to Redcar in North Yorkshire, England. At its height there were 91 blast furnaces within a 10-mile radius of the area. By the early 1990s, when No.4 furnace at Cleveland Iron closed there was only one left on Teesside. Opened in 1979 and located near the mouth of the River Tees, the Redcar blast furnace was the second largest in Europe.
The majority of the steelworks, including the Redcar blast furnace, Redcar and South Bank coke ovens and the BOS plant at Lackenby closed in 2015. The Teesside Beam Mill and some support services still operate at the Lackenby part of the site.
On 1 October 2022, the Basic Oxygen Steelmaking (BOS) Plant at Lackenby was demolished in one of the largest single explosive demolition operations in the country in 75 years.
661 m
Wilton power stations
The Wilton power station refers to a series of coal, oil, gas and biomass fired CHP power stations which provide electricity and heat for the Wilton International Complex, with excess electricity being sold to the National Grid. It is located on the Wilton site in Redcar and Cleveland, south of the town of Middlesbrough in North East England. The station has provided for the site since opening in 1952, when it was operated by ICI. The station is currently owned and operated by SembCorp Industries.
It comprises a variety of generating sets, with units of different ages and various fuels. The station is currently mainly coal and oil fired, but also has a CCGT unit. Wilton 10 was opened at the station in 2007, the UK's first ever large scale biomass only power station. The power station's total generating capacity across all of its units is 227 megawatts. There are plans to build another plant, Wilton 11, a waste to energy plant.
703 m
Lazenby railway station
Lazenby railway station served the village of Lazenby, North Yorkshire, England, from 1846 to 1864 on the Middlesbrough and Redcar Railway.
745 m
Teesside Beam Mill
Teesside Beam Mill (TBM) is a steel reheating and rolling plant located at Lackenby, on Teesside, North Yorkshire, England. The plant was set up in the 1950s by the Dorman Long company and began full production in 1958, making beams for building projects. The plant produces around 750,000 tonnes (830,000 tons) of steel products per year, and is the United Kingdom's only producer of large steel sections for the building industry.
English
Français