Castlefield corridor
The Castlefield corridor (also known as the Deansgate corridor) is a railway corridor between Castlefield junction and Fairfield Street junction in Greater Manchester, England. The corridor forms the eastern end of both of the Liverpool–Manchester lines. The route is recognised as a significant bottleneck, magnified further by the opening of the Ordsall Chord in 2017 and timetable change in May 2018 which increased the number of services through Manchester city centre from 12 to 15 trains per hour. This uplift in services had a detrimental impact on punctuality and reliability, ultimately playing a major factor in the failure of the Arriva Rail North franchise in 2020. As of August 2021, 12 trains per hour pass through the Castlefield corridor.