Buccleuch Dock
Buccleuch Dock is one of the four docks which make up the Royal Port of Barrow in Barrow-in-Furness, England. It was constructed between 1863 and 1872 to the same specification as the attached Devonshire Dock - the docks having been separated by a bridge for most of their lifetime. Buccleuch Dock covers 125,000 square metres (1,350,000 sq ft) and was named after the 5th Duke of Buccleuch, who invested heavily in Barrow's public services during the late 19th century. Buccleuch Dock is owned by Associated British Ports and is also used by BAE Systems (previously VSEL) where the majority of the shipyard's surface vessels are docked for fitting out.
Nearby Places View Menu
0 m
Ramsden Dock
Ramsden Dock is one of the four docks which make up the Royal Port of Barrow in Barrow-in-Furness, England. It was constructed between 1872 and 1879 covering 162,000 square metres (1,740,000 sq ft) and named in honour of Sir James Ramsden; a founder of Barrow. Ramsden Dock splits into two parts in the south, the anchor basin and dock basin. Since the infilling of a section of Devonshire Dock in the 1980s, Ramsden Dock has been the only point of entry to Barrow's now enclosed port. Managed by Associated British Ports, Ramsden Dock is by far the busiest of the four dock in terms of cargo tonnage, handling shipments of limestone, sand, aggregates and granite. Ramsden Dock and the Royal Port of Barrow as a whole are highly involved in the energy sector and the nearby Rampside Gas Terminal, Sellafield nuclear facility and offshore windfarms. The port office is located adjacent to Ramsden Dock. Powerboat racing often takes place in Ramsden Dock, while a proposed redevelopment scheme of the area incorporates a watersports centre within the dock.
Historically, Ramsden Dock was a major transportation hub with a dedicated railway station connected to a branch of the Furness Railway and a terminus of the Barrow-in-Furness Tramway. A passenger ferry terminal at the dock was utilised by the Isle of Man Steam Packet Company and Barrow Steam Navigation Company offering steamer services to the likes of Belfast and Douglas, Isle of Man. A rail line along the eastern perimeter of Ramsden Dock remains in use to this day with freight services to and from the dock.
341 m
The Waterfront Barrow-in-Furness
The Waterfront Barrow-in-Furness is a £200 million development under construction in and around the Port of Barrow, England. The site covers an area of some 400 acres (160 ha) and was due for completion in 2020. The internal road network is already complete, with construction of a large business park complex ongoing and work on a 400-berth marina and 650 home Marina Village due to start thereafter. In 2010, The Waterfront Barrow-in-Furness ranked as the ninetieth most costly regeneration project in the United Kingdom by Regeneration & Renewal. Progress on the project stalled between 2010 and 2016 due to complications with funding following the disabandonment of the North West Regional Development Agency. BAE Systems opened a large logistics warehouse named the Resolution Building on Dova Way within the designated Business Park Area in October 2016, while and construction of a new access road from Salthouse Road to the Marina Village commenced in May 2017.
609 m
Cavendish Dock
Cavendish Dock is one of the four docks which make up the Royal Port of Barrow in Barrow-in-Furness, England. Covering some 591,000 square metres (6,360,000 sq ft) it is roughly the size of Barrow's other three docks combined. It is named after William Cavendish, 7th Duke of Devonshire who invested heavily in the industrial growth of Barrow. Cavendish Dock is owned by Associated British Ports, however it is now entirely enclosed serving as a reservoir. It is also a popular fishing destination due to the diverse and unique wildlife found as a result of the control of water in and out the dock. Fishing is controlled by Barrow Angling Association and memberships are required to fish the water.
During the early 20th century, Cavendish Dock was home to an airship construction facility before the works were transferred to nearby Barrow/Walney Island Airport.
792 m
Barrow-in-Furness Strand railway station
Barrow-in-Furness Strand railway station was the first permanent railway terminus to be built in Barrow-in-Furness, England. Located on the Strand at St. George's Square close to the town's docks its functioning life was short, however the building itself continued to be used as the headquarters of the Furness Railway for a number of years. The station opened in 1863 having replaced a wooden structure which was erected in 1846 at adjacent Rabbit Hill. The station at St. George's square ceased commercial operations in 1882 upon the completion of a new loop line and much larger station at Abbey Road. Barrow-in-Furness Central railway station, later simply renamed Barrow-in-Furness railway station has been the town's primary station ever since.
The railway station building is Grade II listed and spent most of its later life as a working men's club.
English
Français